Water Booster Pump Sets
Uses residual municipal pressure with variable-frequency constant-pressure control to reduce energy use and protect water hygiene.
YUANHENG AUTOMATION TECHNOLOGY
Premium Galvanized Steel Pipe & Smart Water Solutions
From individual components to complete systems, we engineer reliability into every detail.
Built to Endure
Engineered to Advance
From water supply and drainage to pollution control, we integrate equipment, controls, and service into one engineering system.
Uses residual municipal pressure with variable-frequency constant-pressure control to reduce energy use and protect water hygiene.
Configured for each project and factory-integrated to shorten on-site construction.
Combines biological treatment, automation, and underground installation for efficient use of space.
Treats odors, musty smells, TVOC, benzene, formaldehyde, and other contaminants.
Extends our manufacturing chain with supporting materials for environmental equipment and engineering projects.
Transform pump rooms from reactive inspection into continuous sensing, rapid diagnosis, and remote coordination.
Variable-frequency control, fault diagnosis, and automatic degraded operation
Video surveillance, access control, smoke detection, and security alarms
Online monitoring of flow, water quality, residual chlorine, turbidity, and pH
RS485 and wireless communications for remote data transmission
Communication interfaces and protocols can be configured to suit project requirements.
Yuanheng focuses on the R&D, design, manufacture, and sale of secondary water supply, pump station, and environmental treatment equipment. Our Jiangsu base strengthens domestic manufacturing, while our Hainan Free Trade Port base connects us with international markets.
Hangzhou Yuanheng Automation Technology Co., Ltd. was established with registered capital of RMB 50 million.
Yuanheng Automation Technology (Jiangsu) Co., Ltd. was founded with registered capital of RMB 100 million.
Yuanheng joined the Xiangqiong Advanced Manufacturing Industrial Park in Dongfang, with a Phase I floor area of 20,265 m².
Installation, commissioning, training, maintenance, and spare-parts support cover the full equipment lifecycle.
We assess quality reports promptly and provide a clear response.
Technical personnel are dispatched to resolve issues in line with project commitments.
We maintain dual equipment records, stock spare parts, and conduct regular follow-ups.
Bringing clean water and fresh air to more communities
No. 78 Cixi Road, Shuyang Economic and Technological Development Zone, Suqian, Jiangsu, China